Our refurbishment program is built around our key Performance Testing Process (PTP).
We test all processes, controls and functions for X-Ray Beam and Alignment:
- 5-Minute Fluoro Timer
- Emergency Off Switch
- Footswitch
- Handswitch Control
- Control Panel Controls
- Generator Accuracy
- Dose Rate
- High Level Fluoro Boost
- Fluoro Resolution in
- NORMAL
- MAG 1
- MAG 2
- Fluoro Penetration
Next we inspect all mechanical functions:
- Emergency OFF Switch
- Footswitch
- Handswitch Control
- Brakes
- Steering Wheel
- Wheels and Casters, Locks
- Static Drag Wire
We check all electrical functionality:
- Ground OHMS Continuity
- Power Cords
- Limit Switch
- Technique Display
- Control Panel Lamps
- Collimator Controls
Final steps include cosmetic and safety checks:
- Smooth all dents and scratches
- Repaint with OEM color paint
- Install new CRt inserts in monitors
- Replace Batteries (OEC only)
- Replace High Voltage Cabling
- Replace Interconnect Cabling
- Scan system hard drive for viruses
- SRAM Battery replaced
- Air Filters cleaned or replaced
- Lubricate all applicable areas
- Service the monitor fans
The result is a system that will produce high-quality images, prove cost-effective for long term usage and provide you with years of uninterupted service.